
Harrah’s Casino and Racetrack, Chester, PA-$11,300,000.00
Harrah’s site includes a 100,000 SF gaming hall and horse race track. The riverfront site construction included special headwalls with ...
Read More
Read More

NJ Motorsports – Thunderbolt Raceway-$6,497,000.00
Thunderbolt Raceway, a $100 million dollar project, was developed over a 700-acre site in Millville, NJ. C Abbonizio was responsible ...
Read More
Read More

Revel Casino-$53,718,206.00
Revel’s hotel tower is the tallest structure in Atlantic City and the second tallest in the state of New Jersey ...
Read More
Read More

W Hotel-$10,651,000.00
Abbonizio Contractors, Inc. completed all earthwork, shoring of excavation and underpinning work of the former parking lot and replaced with ...
Read More
Read More

295 Phase 1-$42,000,00.00
Work included various clearing and erosion control along Routes 295/42/76 to meet New Jersey Department of Transportation and New Jersey ...
Read More
Read More

New Jersey Turnpike
Exit 7A-$21,775,000.00 75 acres of clearing. Installation of 55,000 cubic yards of topsoil strip, 448,000 cubic yards of roadway and ...
Read More
Read More

PennDOT Germantown Avenue-$17,250,000.00
The reconstruction of Germantown Avenue, Philadelphia, PA to rehabilitate existing stone arch bridge built in 1880, removal of exiting 14” ...
Read More
Read More

Foxwoods Lot 9 Expansion-$36,081,000.00
Work performed included rock blasting 267,000 cubic yards on site, rock crushing 186,000 cubic yards, 326,000 cubic yards of bulk ...
Read More
Read More

Burlington Co Landfill-$13,200,000.00
Scope of work consisted of site clearing, soil erosion and sediment control improvements, and pratices and staging area construction; milling ...
Read More
Read More

SEPTA Frazer Shop & Yard Expansion I – $19,902.060.00
The work of this contract provides for site work including temporary structures, maintenance of traffic plans; demolition and disposal of ...
Read More
Read More